The Overview — project health at a glance

A dashboard, scoped to the current project, sub-project, or all of them:

  • One sentence at the top, saying what to do next: a lost deadline first, then one the plan says is about to be lost, then something blocked, then nothing under way — and when none of those is true it says so instead of disappearing. It never states a number the rest of the page doesn't show.
  • Under it, one status strip carrying the scope's facts side by side: Lead, Completion (with progress bar and "2 of 25 tasks done"), In progress (and "N in review"), Blocked (the count turns red, subtitled "needs attention" — or "all clear"), and Next milestone.
  • Lead is the one of those that names a person rather than a number: the accountable owner's picture and name, with the owning team under it — or "Inherited from \<project\>" on a sub-project that names no lead of its own. It leads the strip so the page reads as a sentence: who owns this, how much is done, what is moving, what is stuck, what is next. It is where the lead is said now that the top bar no longer carries an avatar. In All projects and My view there is no one such person, so it is absent and the strip closes over the gap.
  • At project scope, Sub-project health: a sortable table, one row per sub-project — lead, progress (a stacked status bar and a %), Done ("3/12"), Left (remaining hours), and three columns that count trouble: Delayed and Slipping for the projected verdicts, Blocked for tasks waiting on something. A zero reads "—", not "0", so the counts that matter are the only numbers there. Any heading sorts by its column, and again to flip it; the table opens on Delayed, worst first — "which of these is in trouble" is what the section is for. Click a row to jump to that sub-project's board. There is no milestone column — a milestone belongs to a project, not a sub-project, and Milestones below is where it lives. In All projects and My view the same table reads one row per project (Project health), and clicking one opens that project's board — in My view over your own tasks, and only for the projects you have some in. At sub-project scope, a single Status distribution bar instead.
  • Overdue & at risk — deadlines lost or being lost: tasks past their due date (done ones excluded) with "Nd overdue" in red, plus — for projects that track delays — tasks projected to miss their due date, marked "projected to miss" (the tooltip carries the projected finish week). Blocked tasks — with the blocked reason in the tooltip. Click any row to open the task.
  • Milestones — the project's milestone list with a relative chip ("this week", "in 3w", "2w ago"); the next one is highlighted. Add or edit milestones right here.